Part of Project Aurora for global pharmaceutical corporation – CSL Behring. The job involved reticulating steam supply and condensate return pipework between existing boiler house, Base Fractionation Facility and Tank Farm.
Key Scope:
- 1200m of saturated steam/ steam condensate pipework insulation
- Glasswool and rockwool insulation materials
- Galvanised steel sheathing